Pipeline Construction Manager - Paris, France - VINCI Energies

VINCI Energies
VINCI Energies
Entreprise vérifiée
Paris, France

il y a 3 semaines

Sophie Dupont

Posté par:

Sophie Dupont

beBee Recruiter


Description

Job title:
Pipelines Construction Manager Services


Sector:
Gas Upstream Project


Starting date:01/06/2024


Duration:
One Year


Renewable:
Yes


Location:
France during FEED phase, relocation in Iraq for execution phase.

Place of mobilization:
France, Paris or Pau for 2024, and Iraq on rotational position in

2025


Status:
Resident


Language:
English mandatory, Arabic would be a plus.


MISSIONS/ SERVICE DIMENSIONS


The job holder is responsible and accountable for all the construction activities related to the Pipelines and Well pads of the AGUP ph2 project, in conformity with the project technical referential, H3SE rules, and within the agreed budget, schedule and Statement of Requirements.


The Iraq AGUP phase 2 Project (Associated Gas Upstream Project) is a key project for the Client as it is a major petroleum investment and also part of an overall portfolio of four GGIP (Growth Gas Integrated Project) projects in Iraq.

AGUP phase 2 project is an onshore greenfield project, comprising the following main elements:

  • new Well pads (15) and the upstream gathering network including multiphase and water injection trunklines and power distribution network.
- upstream Central Processing Facility (CPF) located in Ratawi field area and adjacent to GMP CPF (Gas Midstream Project, also part of GGIP);
- integration of existing AGUP phase 1 upstream facilities (wellpads) into AGUP phase 2 production networks.

  • Main export system consisting of a singlephase oil pipeline.
  • Ratawi oil field comprises 4 reservoirs, including low pressure sweet crudes and high pressure sour crudes, approx. 300 wells overall (200 producers and 100 water injectors).


Production Data: 210 kbopd of crude oil (+160MMscfd of raw gas and 7.8 kbpd of raw condensate) + 550kbwpd water injection.

Staff managed (number of personnel): ± 05


ACTIVITIES


The job holder is responsible:


  • To define, propose and manage the organization of a construction team dedicated to the Pipelines and Pads Works activities, and to ensure an appropriate plan for mobilization.
  • To ensure that the Pipelines and Pads activities meet all Project requirements, and comply with all applicable rules, codes and standards, specifically with regards to H3SE requirements.
  • To contribute to update regularly, at least quarterly, the Risk register of the package and implement the corresponding mitigation actions.
  • To contribute to identify and promote innovative and costeffective solutions.
  • To contribute to implement the local content plan as approved, and for motivating contractors to effectively carry out all necessary steps (including recruitment and training of Iraqi nationals).
  • During FEED Phase (including EPC CFT phase), the job holder is responsible:
  • To work closely with the engineering team to maximize value enhancement opportunities, especially with regards to Pipelines and Pads construction strategy.
  • To contribute to the Pipelines and Well pads CFT process, from preparation of tender documentation to RTA.
  • To organize and participate Site visits with Company representatives and Pipelines and Pads Bidders.
  • To study the construction strategy based on past projects lessons learned and estimated productivity factors.
  • During the Pipelines and

Pads Construction Phase:


The job holder is responsible:


  • To prepare the Pipelines and Pads mobilization at site.
  • To manage Company site supervision team and all Contractors and Subcontractors during Construction phase of Pipelines and Pads
  • To deliver of the Pipelines and Pads as per the agreed budget and the planned schedule.
  • Responsible to manage, evaluate and challenge the Contractors and Subcontractors' performance on weekly basis through direct reports.
  • Responsible to provide oversight of Contractors and Subcontractors' performance/productivity including Health and Safety, Environmental, Community Relations, Quality assurance, Schedule and Cost including measurable items.
  • Ensure that accurate daily records of Contractors/Subcontractors' activities are kept and promptly notify the project control team of any issues that may have commercial implication (Claims), and Support Company contract team in the administration of EPC Contract.

CONTEXT & ENVIRONMENT
Agreements were signed by the Client in Iraq to enhance the development of the country's natural resources.

The GGIP project, located in the Basra region, is a 4-in-1 project:


  • The Associated Gas Upstream Project AGUP: Enhance Ratawi oil field production thanks to infrastructures upgrade and new export pipeline (Phase I), then a new CPF and additional development wells (Phase II). A 3D seismic will be acquired on Ratawi field prior to the Phase II.
  • The Gas Midstream Project GMP: Valorize the gas from Ratawi, Majoon and Al Qurna West2 (Phase I) oil fields.
  • The Common Seawater Supply Project CSSP: Major waterinjection project that will help the longterm production of several fields of South I

Plus d'emplois de VINCI Energies