Oss Hv Inspector - Saint-Nazaire, France - Aventa
Description
Current Project Phases
Manufacturing / Fabrication & Test
Role Definition
ACTIVITY 1 :
Activities on CDA Yard - Saint
Nazaire FRANCE
- Follow up, review, control, monitor & support all the HV electrical contractor information
May 23 -Aug 24:
- Folow up of the 66 kV GIS assembling & outfitting and testing activities.
Sep 2
- May 24
- Followup of the 225 kV GIS assembling & outfitting and testing activities.
Sep 2
- May 24
- Follow up of the main power transformer assembling & outfitting and testing activities.
Sep
2
- May 24
- Follow up of the main power transformer assembling & outfitting and testing activities.
Sep
2
- May 24
- Follow up ofthe auxiliary transformer assembling & outfitting and testing activities.
Sep 2
- May 24
- Follow up of t h e Neutral Earthing reactor assembling & outfitting and testing activities.
Sep 2
- May 24
- Follow up of the HV and MV cable pulling, routing, termination and testing activities
Sep23- May24:
- Follow up the control and protection / OSS power SCADA works.
Sep 2
- May 24
- Follow up of the Site Integration Tests.
Sep 23 - May 24
ACTIVITY 2 :
Witnessing the FAT tests in Factories in Europe
- Production of HV/MV cables
July-Sept 2023:
- Manufacturing of the GIS units in Siemens factories
May - Sept 2023:
- Manufacturing main Transformers in ABB / Hitachi
June - Oct 2023:
- Manufacturing Aux-Earthing Transformers at CELDUC.
May - July 2023
ACTIVITY 3 :
Offshore Activities NOY site
- Follow up of the offshore outfitting CDA HV activities
June -July 2024:
- Following up of Sea Cable pulling, routing, installation and testing activities
Aug - Nov 2024:
- Followup Hot commissioning OSS
Nov - Dec 2024:
- Follow up of the Runtest with 56 WTG's installed. **Aug
- Oct 2025**
Participation to Meetings & Workshops
In order to ensure a continuous communication between the Client and the Service Provider, a series of meetings wil be organised by Client throughout the duration of the Contract.
Coordination Meetings
Most of the meeting will take Place at CDA's yard in Saint Nazaire. Among the recurrent meetings organised by Client, the Service Provider may be requested to attend to monthly coordination meetings.
These meetings will aim at:
- Measuring performance of the Contract execution,
- Reviewing upcoming needs for additional activities and termination of ongoing activities as the case may be,
- Holding discussions on challenges, difficulties, lessons learnt.
Adhoc Meetings & Workshops
In addition, various ad-hoc meetings or workshops will also take place. If Client judges ti relevant, the Service Provider will be requested to attend to these ad-hoc meetings.
Qualification
- BOSIET
Conditions
Location :
site base
Others informations
Duration: 2 years
Type of contract:
Contractor
Seniority level:
Inspector
Type of project:
OffSHORE WIND Farm
Countries:
France
Location:
St Nazaire + Offshore
Type d'emploi :
CDD
Durée du contrat : 24 mois
Exigences linguistiques flexibles:
- Français non requis
Lieu du poste :
En présentiel
Plus d'emplois de Aventa
-
NAVAL Architect H/F
Paris, France - il y a 1 semaine
-
Installation Methods Senior Engineer H/F
Paris, France - il y a 1 semaine
-
Senior HSE Engineer Offshore H/F
Paris, France - il y a 1 semaine
-
Installation Analysis Engineer
Paris, France - il y a 1 semaine
-
Collaborateur Comptable Junior H/F
Bordeaux, France - il y a 4 semaines
-
Offshore Project Engineer
Marseille, France - il y a 1 semaine