Early Works Construction Manager - Paris, France - VINCI Energies

VINCI Energies
VINCI Energies
Entreprise vérifiée
Paris, France

il y a 2 semaines

Sophie Dupont

Posté par:

Sophie Dupont

beBee Recruiter


Description

Job title:
Early Work Construction Manager


Sector:
Gas Upstream Project


Starting date:01/06/2024


Duration:
One Year


Renewable:
Yes


Location:
France during FEED phase, relocation in Iraq for execution phase.

Place of mobilization:
France, Paris or Pau for 2024, and Iraq on rotational position in

2025


Status:
Resident


Language:
English mandatory, Arabic would be a plus.


MISSIONS/ SERVICE DIMENSIONS


The job holder is responsible and accountable for all the construction activities related to the Early Works of the AGUP ph2 project, in conformity with the project technical referential, H3SE rules, and within the agreed budget, schedule and Statement of Requirements.


The Iraq AGUP phase 2 Project (Associated Gas Upstream Project) is a key project for the Client as it is a major petroleum investment and also part of an overall portfolio of four GGIP (Growth Gas Integrated Project) projects in Iraq.

AGUP phase 2 project is an onshore greenfield project, comprising the following main elements:

  • new Well pads (15) and the upstream gathering network including multiphase and water injection trunklines and power distribution network.
- upstream Central Processing Facility (CPF) located in Ratawi field area and adjacent to GMP CPF (Gas Midstream Project, also part of GGIP);
- integration of existing AGUP phase 1 upstream facilities (well pads) into AGUP phase 2 production network;

  • Main export system consisting of a singlephase oil pipeline.
  • Ratawi oil field comprises 4 reservoirs, including low pressure sweet crudes and high pressure sour crude, approx. 300 wells overall (200 producers and 100 water injectors).


Production Data: 210 kbopd of crude oil (+160MMscfd of raw gas and 7.8 kbpd of raw condensate) + 550kbwpd water injection.

The early works scope includes the following main elements:

  • Site clearing (300 hectars) of new logistic base, roads network, central processing facilities, construction camp areas and Well pads (7 pads, 70 hectars) areas of phase 2A scope,
  • Site preparation for new logistic base, roads network, well pads and central processing platforms, and construction camp platforms to the acceptable level for main construction works and drilling campaign start.
  • Infrastructure development
- new logistic base incl. buildings, facilities.
- roads constructions (50 Km network in early works) on CPF and well pads, access roads,

and trucklines ROW ways.
- well pads pre-installed concrete works (cellars, culverts) for drilling execution.
- early/pioneer camp for construction.
- advanced Security precautions
  • Global Restricted Area (concrete Twalls, security
paths, airlocks).

  • Staff managed (number of personnel): ± 05

ACTIVITIES


The job holder is responsible:


  • To define, propose and manage the organization of a construction team dedicated to the Early
Works activities, and to ensure an appropriate plan for mobilization.

  • To ensure that the Early Works meet all Project requirements, and comply with all applicable
rules, codes and standards, specifically with regards to H3SE requirements.

  • To contribute to update regularly, at least quarterly, the Risk register of the package and
implement the corresponding mitigation actions.

  • To contribute to identify and promote innovative and costeffective solutions.
  • To contribute to implement the local content plan as approved, and for motivating contractors to
effectively carry out all necessary steps (including recruitment and training of Iraqi nationals).

During FEED Phase (including EPC CFT phase), the job holder is responsible:

  • To work closely with the engineering team to maximize value enhancement opportunities.
especially with regards to Early Works construction strategy.

  • To contribute to the CFT process for Early Works, from preparation of tender documentation to
RTA.

  • To organize and participate Site visits with Company representatives and Early Works Bidders.
  • To study the construction strategy based on past projects lessons learned and estimated
productivity factors

During the

Early Works Construction Phase:


The job holder is responsible:


  • To prepare the Early Works mobilization at site.
  • To manage Company site supervision team and all Early Works Contractors and Subcontractors
during Construction phase of Early Works

  • To deliver of the Early Works as per the agreed budget and the planned schedule.
  • Responsible to manage, evaluate and challenge the Contractors and Subcontractors'
performance on weekly basis through direct reports.

  • Responsible to provide oversight of Contractors and Subcontractors' performance/productivity
including Health and Safety, Environmental, Community Relations, Quality assurance, Schedule

and Cost including measurable items.

  • Ensure that accurate daily records of Contractors/Subcontractors' activities are kept and promptly
notify the project control team of any issues that may have commercial implication (Claims), and

Support Compa

Plus d'emplois de VINCI Energies